Four Oaks Wastewater Pump Station Improvements
UPDATED: February 10, 2026
- Project Start Date: August 1, 2024
- Contractor: Sanford Contractors
- Construction Contract: $3,574,400
- Expected Completion Date: February 28, 2026
- Description: This project involves several upgrades to the existing Four Oaks Wastewater Pump Station. The work includes adding a sewage grinder, demolishing existing pipes, valves, fittings, HVAC, and electrical equipment within the current Effluent Pump Station building. A new gravity sewer will be constructed to redirect wastewater to a proposed submersible sewage Effluent Pump Station and valve vault. The project also entails installing new electrical equipment in the converted existing Effluent Pump Station building, adding bypass pump connections, a flow meter vault for the proposed Effluent Pump Station, and replacing the existing liquid chemical odor control feed system.