Four Oaks Wastewater Pump Station Improvements

Four Oaks Wastewater Pump Station Improvements

UPDATED: February 10, 2026

  • Project Start Date: August 1, 2024
  • Contractor: Sanford Contractors
  • Construction Contract: $3,574,400
  • Expected Completion Date: February 28, 2026
  • Description: This project involves several upgrades to the existing Four Oaks Wastewater Pump Station. The work includes adding a sewage grinder, demolishing existing pipes, valves, fittings, HVAC, and electrical equipment within the current Effluent Pump Station building. A new gravity sewer will be constructed to redirect wastewater to a proposed submersible sewage Effluent Pump Station and valve vault. The project also entails installing new electrical equipment in the converted existing Effluent Pump Station building, adding bypass pump connections, a flow meter vault for the proposed Effluent Pump Station, and replacing the existing liquid chemical odor control feed system.
  • Map


Pipe Icon
CONTACT

Johnston County Public Utilities Engineering Department

919-209-8333