
Buffalo Road Parallel Force Main
UPDATED: July 18, 2025
The work will be located along Buffalo Road (SR 1003) from the Buffalo Wastewater Pump
Station to a connection point with the existing 16” sewer force main on the west side of Buffalo
Road, approximately 2,900 feet north of the intersection with Durwood Stephenson Parkway
(SR 1923) and Buffalo Road and will consist of the construction of approximately:
Base Bid
· Approximately 8,800 LF of 20-inch sewer force main installed by open cut
· Approximately 150 LF of 36-inch steel casing and 20” RJ ductile iron carrier pipe
installed by bore and jack beneath NCDOT roadway
· Approximately 568 LF or 24-inch HDPE pipe installed by horizontal directional drill
· Associated appurtenances, erosion control, cleanup, testing, traffic control, etc.


CONTACT
Project Started On:
June 15, 2025
QUICK LINKS
Page last updated: July 18, 2025