Austin Pond Wastewater Pump Station Modifications
UPDATED: July 24, 2025
The Project includes the following Work:
• Modifications include the addition of a second wet well connected to and adjacent to the existing wet well with two (2) submersible pumps and a second valve vault along with two (2) flow meters and associated meter vaults, new influent manhole and channel grinder, new electrical rack and generator sized for new electrical loading, and modification to the Winston Pointe WWPS onsite force main discharge.


CONTACT
Project Started On:
January 1, 2025