2022-09-08 Certified Bid Tabulation
This PDF document may not meet current accessibility standards (WCAG 2.1 AA) and may not be fully usable with assistive technologies.
If you require access to the information in a more accessible format, please e-mail webstaff@johnstonnc.gov and we will provide an alternative version as soon as possible. A machine-generated text version is also available below.
We apologize for any inconvenience and appreciate your understanding as we work toward full accessibility compliance.
If the document does not display above, download the PDF.
Text version (machine-generated from the PDF)
10 BID TABULATION SHEET OWNER Johnston County Airport Authority Three Corporate Hangars PROJECT LOCATION 3149 Swift Creek Rd , Smithfield , NC 27577 DATE September 8 , 2022 COOPER TACIA GENERAL CONTR ~ SIMCON COMPANY , LLC Im AMOND CONTRACTING , me 285 Shipwash Dr , Ste 101 Address 306 Parham St , Ste 200A PO Box 1838 l rm , Garner , NC 27529 Raleigh , NC 27601 Moun ty Airy , NC 27030 NC License No 34909 NC License No 65299 NC License N o 65243 u ~ N ~ • • ~ ITEM NO DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE SCHEDULE I Hanger 5 Hangar Building Construction - Complete LS 744,26800 744,26800 767,00000 767,00000 1,154,88900 1,154,88900 Interior Painting - Exposed Structural Steel Hangar Bay 6,48000 6,48000 2 LS 21,00000 21,00000 22,00000 22,00000 Hangar Bay - Radiant Heat LS 17,33000 17,33000 8,20000 8,20000 20,00000 20,00000 3 Hangar Bay - 12 Ceiling Fan 17,44500 17,44500 4 LS 8,50000 8,50000 20,00000 20,00000 Undercut Excavation , Replace with Backfill 150 CY 5000 7,50000 7,20000 5 4800 10000 15,00000 Utility Fees ALLOW 15,00000 15,00000 15,00000 15,00000 15,00000 15,00000 6 BASE BID - SCHEDULE I HANGAR 5 808,02300 1,246,88900 826,90000 ADDITIVE ITEMS - SCHEDULE I HANGAR 1 1 - A 2,15000 2,15000 Ceramic Tile Floor Covering - Office & Restroom - Complete LS 3,00000 3,00000 4,50000 4,50000 2 - A Shower Area - Complete LS 6,74500 6,74500 5,00000 5,00000 10,00000 10,00000 6,78500 3 - A Hangar Bay - Interior Wall Metal Linear Panel Extend to Full Height LS 6,78500 20,00000 20,00000 14,00000 14,00000 ADDITIVE BID - SCHEDULE I HANGAR 5 15,68000 28,00000 28,50000 TOTAL BID - SCHEDULE I HANGAR 5 - BASE + ALL ADDITIVES 823,70300 854,90000 1,275,38900 SCHEDULE II HANGAR 4 Hangar Building Construction - Complete LS 775,96700 775,96700 781,00000 781,00000 1,104,88900 1,104,88900 6,48000 2 Interior Painting - Exposed Structural Steel Hangar Bay LS 6,48000 21,00000 21,00000 22,00000 22,00000 17,33000 17,33000 8,20000 8,20000 20,00000 3 Hangar Bay - Radiant Heat LS 20,00000 4 Hangar Bay - 12 Ceiling Fan LS 17,44500 17,44500 8,50000 8,50000 20,00000 20,00000 Undercut Excavation , Replace with Backfill 150 CY 5000 7,50000 7,20000 15,00000 5 4800 10000 Utility Fees ALLOW 15,00000 15,00000 15,00000 15,00000 15,00000 15,00000 6 BASE BID - SCHEDULE II HANGAR 4 839,72200 840,90000 f , 196,88900 ADDITIVE ITEMS - SCHEDULE II HANGAR 4 1 - A 2,15000 2,15000 3,00000 4,50000 Ceramic Tile Floor Covering - Office & Restroom - Complete LS 3,00000 4,50000 2 - A Shower Area - Complete LS 6,74500 6,74500 5,00000 5,00000 10,00000 10,00000 6,78500 6,78500 14,00000 3 - A Hangar Bay - Interior Wall Metal Linear Panel Extend to Full Height LS 20,00000 20,00000 14,00000 ADDITIVE BID - SCHEDULE II HANGAR 4 15,68000 28,00000 28,50000 TOTAL BID - SCHEDULE II HANGAR 4 - BASE + ALL ADDITIVES 855,40200 1,225,38900 868,90000 SCHEDULE III HANGAR 12 1,190,44800 Hangar Building Construction - Complete LS 1,190,44800 1,770,00000 1,770,00000 1,732,77800 1,732,77800 Interior Painting - Exposed Structural Steel Hangar Bay 10,24000 10,24000 32,00000 32,00000 32,00000 32,00000 2 LS Hangar Bay - Radiant Heat LS 20,19000 20,19000 8,20000 8,20000 35,00000 35,00000 3 18,96000 18,96000 4 Hangar Bay - 16 Ceiling Fan LS 8,50000 8,50000 22,00000 22,00000 Undercut Excavation , Replace with Backfill 250 CY 5000 12,50000 12,00000 10000 25,00000 5 4800 15,00000 Utility Fees ALLOW 15,00000 15,00000 15,00000 15,00000 15,00000 6 BASE BID - SCHEDULE III HANGAR 12 1,267,33800 1,845,70000 1,861,77800 ADDITIVE ITEMS - SCHEDULE III HANGAR 12 2,83000 2,83000 4,60000 4,60000 4,50000 4,50000 1 - A Ceramic Tile Floor Covering - Office & Restroom - Complete LS 6,74500 2 - A Shower Area - Complete LS 6,74500 5,00000 5,00000 10,00000 10,00000 3 - A Hangar Bay - Interior Wall Metal Linear Panel Extend to Full Height 13,85000 13,85000 22,00000 22,00000 20,00000 20,00000 LS ADDITIVE BID - SCHEDULE II HANGAR 12 23,42500 31,60000 34,50000 TOTAL BID - SCHEDULE III HANGAR 12 - BASE + ALL ADDITIVES 1,290,76300 1,877,30000 1,896,27800 SCHEDULE IV Deduct to be applied to the total contract cost if Bid Schedules I , II , and III are awarded to the 100,00000 100,00000 Contractor a one time LS 100,00000 SCHEDULE IV WKD # 2019051 B 00 RA Johnston Regional Airport - Three Corporate Hangars 1 ofl Bid TabulationPage